Looking for help?
-
Business User Training
-
Contact Center Administrator Training
-
Contact Center Agent Training
-
-
-
- Answer an ACD Call
- Disconnect an ACD Call
- Enter Notes on an ACD Call
- How to Blind Transfer an ACD Call
- How to Consult Transfer an ACD Call
- How to Place an ACD Call on Hold
- Locate Dialpad While on an ACD Call
- Locate the Mute Icon on an ACD Call
- Manage ACD Emails
- Manage ACD Messages
- Manage After Call Work
- Schedule an ACD Callback
- Secure Pause an ACD Call
-
Contact Center Supervisor Training
-
Quality Manager Training
< All Topics
Print
Request Time Off from Work
PostedJune 13, 2023
UpdatedJuly 5, 2023
Brief Description
This workflow describes the steps for requesting time off from work in the Genesys system.
NOTE: The following legends indicate the details of where your time off request will appear. Additionally, the long waitlist is only available if clients are using the automated time off feature. If clients are using the manual time off feature, the calendar will not show the calendar legends.
Table of Contents